Project of dismantling of metal spaced structures of roofing of Ice Palace in Simferopol city (Crimea) with area of 1.0 ha. 6 pipe-like columns with the height of 20 m can be the structure supports with the weight of 1500 ton. Calculations were performed on the dynamic impact of hit with structures dismantling on the neigh boring houses. Columns have been cut in the same direction and with the help of tractors that were pulling the structure with tows; it was dropped to the ground on the sand ramps of the height of 2.5 m. Preparation for dismantling of the central part took 2 weeks, lowering of the central part took 10 seconds.